- One sentence saying what you want to find out
- The profile of each peptide you are considering, read through
- Your medications and supplements added in Account → Medications, so the builder can flag known interactions
- For injectables: the vial size (mg) and how much you will add
The five steps
Goal & context
Name the protocol, choose a research goal, and set a start date, a planned length in weeks and an optional . Notes are for context: what you want to learn, anything relevant about your starting point.
Editor templates show how a protocol is structured. They are illustrations, not recommendations.Peptides
Add compounds from the library. Each gets its own dose, unit, route, frequency and timing. For vials, enter the amount and and the builder works out the concentration and the syringe mark for your dose.
Flags appear when two compounds act on the same pathway or a profile lists an interaction with something on your medication list. They are information, never a verdict.Schedule
Tap days to move doses on or off and set the time for each compound. The cycle timeline shows the period, the re-evaluation point and the end. You can switch on reminders here and choose email, push or Telegram.
What to track
The builder proposes metrics for your goal; these become the fields in your daily log. Remove what you won’t measure and add your own, such as “Morning stiffness 0–10”. It also lists the markers researchers commonly monitor for your compounds, to discuss as a baseline blood panel.
Review & save
Check the summary, then either start the protocol or save it as a private draft. From here you can also export a PDF or calendar file, create a read-only link, or choose to publish an anonymous copy to Community Protocols.
The consent question
The first time you save, you are asked for explicit consent to store health data. It is asked once, recorded with the date and wording, and can be withdrawn in Account → Your data. Withdrawing stops all processing; deleting removes the data.
If you say no, nothing is saved and you can keep building. Logging needs the same consent.
Changing a protocol later
Editing an active protocol creates a new version, with a one-line note of what changed. Log entries stay bound to the version that was active on their day, so a chart always shows which plan produced which numbers.